Chapter 1 · Lesson 1.9

From calculation to management: safety report, PPRT, LOPA and ISO 31000

The other courses (Safety report, Industrial risks, “Barriers, LOPA and quantification”) provide calculation and decision tools. ISO 31000 explains how to hold them together, over time, with responsibilities.

What management adds to calculationRisk management: Duration; Decision; Uncertainty; People and culture; Stakeholders; ImprovementRisk managementDurationDecisionUncertaintyPeople and cultureStakeholdersImprovement
The safety report, PPRT and LOPA answer questions; management keeps them true over time.

Updated: October 2026. Sources: text of ISO 31000:2018; courses Safety report, Industrial risks and “Barriers, LOPA and quantification”; links proposed for teaching purposes, with no regulatory value.

Running example: the fictitious “Val-des-Pins” depot

Liquefied petroleum gas (propane) depot entirely fictitious : four horizontal cylindrical tanks, a tanker-truck loading point, a rail-wagon unloading point, a fire-water network, and the first houses a few hundred metres away. The figures are teaching assumptions, with no regulatory value.

Where does each tool fit in the process?

ToolISO 31000 stepRole for Val-des-Pins
Safety report (course Safety report, ch. 1)Assessment + recording and reporting + demonstration of controlRegulatory document that brings together scenarios, rating, measures and justification.
PPRT (course Safety report, ch. 2)Risk treatment (control of urban development, land measures) + communication and consultationReduce the consequences for local residents when the operator cannot reduce them alone; decisions reached through consultation.
PHA (course Safety report, ch. 3)IdentificationList of candidate scenarios.
Detailed analysis : probability, intensity, severity (course Safety report, ch. 4)AnalysisRisk level of each major scenario.
Barriers, SIS and SIL (course “Barriers, LOPA and quantification”, ch. 1; Functional safety: SIS and SIL)Analysis of controls + treatment (likelihood, consequences)Effectiveness of barriers; choice of integrity level.
LOPA (course “Barriers, LOPA and quantification”, ch. 1)Evaluation (comparison with the tolerable frequency gap) + choice of treatmentHow many independent protection layers are needed?
ISO 31000 (this course)Principles, framework, criteria, monitoring, review, cultureWho decides, with what criteria, and how do we know it holds?

The running case, end to end

  1. Framework : the manager adopts the prevention policy, appoints an owner for each major scenario, allocates the barrier maintenance budget.
  2. Criteria : regulatory (2005 order grid) and internal (more demanding).
  3. Identification : PHA and HAZOP; scenarios S1 BLEVE, S2 leak at loading, S3 overfilling, S4 flange leak…
  4. Analysis : probability, intensity, severity with their uncertainties; existing barriers and their PFD.
  5. Assessment : S1 and S3 exceed the criterion: LOPA shows a shortfall of one protection layer.
  6. Treatment : an independent SIS; a mound; inventory reduction; for local residents, PPRT measures. The residual risk is then evaluated.
  7. Monitoring : periodic tests, maintenance backlog, bypasses, near misses, SMS audits. Management review: update of the safety report, the criteria and the controls.

What management adds to calculation

Duration

PFDs and frequencies assume that tests are done on time and barriers are available. Without monitoring, the calculation becomes wrong without anyone knowing.

Decision

A risk value is not a decision. The criteria, the risk owner and validation by management make it executable.

Uncertainty

Probability values are orders of magnitude; methods must be combined, assumptions made explicit and weak signals monitored.

People and culture

Organisational barriers and behaviour (bypassing, pressure, vigilance) weigh as much as technical barriers.

Stakeholders

Local residents, employees, the authorities, insurers: consultation, transparency, acceptability.

Improvement

Operating experience and audits feed the revision of the safety report, the criteria and the framework.

Checklist

Key takeaway

The safety report answers “ where does the risk stand? ”, the PPRT “ what do we do for third parties? ”, LOPA “ are the barriers enough? ”. ISO 31000 answers “ how do we make sure, over time, that these answers remain true and that they are decided by those who must answer for them? ».