Aurorisk FR

How to run an IEC 62443 assessment

Assess the risks of an industrial system following part 3-2 of the IEC 62443 series: zones, conduits, security levels, requirements. Step by step in Polyodos on a water treatment plant, with and without the AI assistant. Course taught entirely in English.

Graded quizzes, exercises and interactive tools are available in the online course.

Read the first lesson → Create an account Log in to the course

At a glance

Level
Intermediate
Estimated time
about 8 h
Audience
OT engineers and integrators who have to assess the risks of an industrial system.
Recommended first
IEC 62443
Learning outcomes
  • Apply the IEC 62443-3-2 process step by step.
  • Define zones, conduits and target security levels on a water plant.
  • Check the result and compare it with an AI-assisted analysis.
Assessment
A graded quiz for each chapter; in a group, the next chapter opens once the lessons are read and the quiz passed (60% by default, threshold set by the trainer).
Badge
Digital badge (Open Badges format) issued by the trainer once every quiz of the course is passed and the final exam passed at 70%: 20 random questions, 30 minutes, at most 3 attempts, 24 h between two attempts.
Updated

Course outline

Lessons marked “free to read” need no account; the other lessons, the exercises, the quizzes and the answers do.

Chapter 1Understanding the IEC 62443-3-2 approach3 of 3 lessons free to read

What the risk assessment of an industrial system is for and what its concepts are.

Chapter 2The steps of the approach6 lessons

How to conduct each step, before entering it in software.

  • 2.1Define the system and its assets
  • 2.2Initial risk and tolerable risk
  • 2.3Split into zones and conduits
  • 2.4Detailed assessment: threats, likelihood, SL-T
  • 2.5SL-T, SL-C, SL-A: aiming, being able, achieving
  • 2.6Specify the cybersecurity requirements

These lessons need an account. Create an account →

Chapter 3Step by step: the water plant case in Polyodos8 lessons

The six steps of part 3-2 (ZCR 1 to ZCR 6) entered in the software.

  • 3.1The case: the drinking-water treatment plant
  • 3.2Step 0: the project, the context and the scales
  • 3.3Step 1: identify the SUC (ZCR 1)
  • 3.4Step 2: the initial assessment (ZCR 2)
  • 3.5Step 3: zones and conduits (ZCR 3)
  • 3.6Step 4: compare with the tolerable risk (ZCR 4)
  • 3.7Step 5: the detailed assessment (ZCR 5)
  • 3.8Step 6: document the requirements specification (ZCR 6)

These lessons need an account. Create an account →

Chapter 4Check1 lesson

Reference values to verify the input.

  • 4.1Checklist table

These lessons need an account. Create an account →

Chapter 5Step by step: with the AI assistant7 lessons

The study draft by the Polyodos AI (framing, zones and conduits, scenarios), then critical review.

  • 5.1Before starting: AI in Polyodos
  • 5.2Prepare the installation sheet
  • 5.3Launch the AI framing
  • 5.4Review the context and the initial assessment (ZCR 2)
  • 5.5Review the zones and conduits (ZCR 3)
  • 5.6Targeted aids: scenarios in ZCR 2 and in ZCR 5
  • 5.7Critical review: what to check in an AI draft?

These lessons need an account. Create an account →