How to run an IEC 62443 assessment
Assess the risks of an industrial system following part 3-2 of the IEC 62443 series: zones, conduits, security levels, requirements. Step by step in Polyodos on a water treatment plant, with and without the AI assistant. Course taught entirely in English.
- 5 chapters
- 25 lessons
- 1 exercise
- 5 quizzes
Graded quizzes, exercises and interactive tools are available in the online course.
Read the first lesson → Create an account Log in to the course
At a glance
- Level
- Intermediate
- Estimated time
- about 8 h
- Audience
- OT engineers and integrators who have to assess the risks of an industrial system.
- Recommended first
- IEC 62443
- Software used
- Polyodos, IEC 62443 assessment software
- Learning outcomes
- Apply the IEC 62443-3-2 process step by step.
- Define zones, conduits and target security levels on a water plant.
- Check the result and compare it with an AI-assisted analysis.
- Assessment
- A graded quiz for each chapter; in a group, the next chapter opens once the lessons are read and the quiz passed (60% by default, threshold set by the trainer).
- Badge
- Digital badge (Open Badges format) issued by the trainer once every quiz of the course is passed and the final exam passed at 70%: 20 random questions, 30 minutes, at most 3 attempts, 24 h between two attempts.
- Updated
Course outline
Lessons marked “free to read” need no account; the other lessons, the exercises, the quizzes and the answers do.
Chapter 1Understanding the IEC 62443-3-2 approach3 of 3 lessons free to read
What the risk assessment of an industrial system is for and what its concepts are.
- 1.1What is the IEC 62443-3-2 analysis for?free to read
- 1.2Key concepts: SUC, zones, conduits, security levelsfree to read
- 1.3The approach: a funnel in seven stepsfree to read
Chapter 2The steps of the approach6 lessons
How to conduct each step, before entering it in software.
- 2.1Define the system and its assets
- 2.2Initial risk and tolerable risk
- 2.3Split into zones and conduits
- 2.4Detailed assessment: threats, likelihood, SL-T
- 2.5SL-T, SL-C, SL-A: aiming, being able, achieving
- 2.6Specify the cybersecurity requirements
Chapter 3Step by step: the water plant case in Polyodos8 lessons
The six steps of part 3-2 (ZCR 1 to ZCR 6) entered in the software.
- 3.1The case: the drinking-water treatment plant
- 3.2Step 0: the project, the context and the scales
- 3.3Step 1: identify the SUC (ZCR 1)
- 3.4Step 2: the initial assessment (ZCR 2)
- 3.5Step 3: zones and conduits (ZCR 3)
- 3.6Step 4: compare with the tolerable risk (ZCR 4)
- 3.7Step 5: the detailed assessment (ZCR 5)
- 3.8Step 6: document the requirements specification (ZCR 6)
Chapter 4Check1 lesson
Reference values to verify the input.
- 4.1Checklist table
Chapter 5Step by step: with the AI assistant7 lessons
The study draft by the Polyodos AI (framing, zones and conduits, scenarios), then critical review.
- 5.1Before starting: AI in Polyodos
- 5.2Prepare the installation sheet
- 5.3Launch the AI framing
- 5.4Review the context and the initial assessment (ZCR 2)
- 5.5Review the zones and conduits (ZCR 3)
- 5.6Targeted aids: scenarios in ZCR 2 and in ZCR 5
- 5.7Critical review: what to check in an AI draft?