Aurorisk FR

Chapter 1 · Lesson 1.3

Overview of the five workshops

Each workshop answers a question and produces a result that feeds the next one.

The five workshops of EBIOS Risk ManagerWorkshop 1: framing and security baseline; Workshop 2: risk sources and target objectives; Workshop 3: ecosystem and strategic scenarios; Workshop 4: operational scenarios; Workshop 5: risk treatment1. Workshop 1: framing andsecurity baseline2. Workshop 2: risk sources andtarget objectives3. Workshop 3: ecosystem andstrategic scenarios4. Workshop 4: operational scenarios5. Workshop 5: risk treatment
Workshop 1 starts from the organisation, workshops 2 to 4 take the attacker’s point of view, workshop 5 returns to the organisation to decide.
WorkshopQuestionResult
1. Framing and security baselineWhat are we protecting, what are we afraid of, what is the compliance status?Scope, feared events and severity, gaps against the baseline
2. Risk sourcesWho or what could harm the missions, and with what aim?Selected risk source / target objective pairs
3. Strategic scenariosThrough which paths, via which stakeholders?Ecosystem map, strategic scenarios, measures on the ecosystem
4. Operational scenariosHow, technically, and with what likelihood?Modus operandi, likelihood
5. Risk treatmentWhat do we decide, what remains?Strategy, treatment plan, residual risks, monitoring

Two cycles

The strategic cycle revisits the whole study (for example every three years for an accreditation); the operational cycle goes back over the operational scenarios in the light of incidents and new vulnerabilities (for example every year). Their length is set in workshop 1.

Vocabulary of the recent edition

“Continuous security improvement plan (PACS)” becomes “risk treatment plan”; “summary of risk scenarios” becomes “risk assessments”; the “owner” in charge of a business asset is now simply the “owner”. Older software and documents still use the old vocabulary.